MP Board Class 10 Maths Solutions: Appendix 2 Mathematical Modelling
Welcome MP Board Class 10 students! Appendix 2 (A2) introduces the concept of Mathematical Modelling — the art of converting real-world situations into mathematical formulations, solving them, and interpreting the results. Below are complete, step-by-step solutions to all the key questions from this chapter.
Important Concepts & Steps in Mathematical Modelling
- 1. Understanding the Problem: Identify the real-world situation, given parameters, and unknown variables.
- 2. Mathematical Formulation: Translate the real-world situation into mathematical equations, inequalities, or functions using variables.
- 3. Finding the Solution: Solve the formulated mathematical equation using appropriate mathematical techniques.
- 4. Interpretation: Translate the mathematical answer back into real-world terms.
- 5. Validation: Check whether the mathematical result makes practical sense in the context of the real world.
Question 1: What is Mathematical Modelling? Describe the main steps involved in the mathematical modelling process.
Solution:
Definition: Mathematical Modelling is the process of representing real-world problems in mathematical terms, solving them, and using the solution to understand, predict, or make decisions about the real-world situation.
Main Steps Involved:
- Real-World Problem Formulation: Define the real-world context and determine what needs to be measured or predicted.
- Simplifying Assumptions: Make reasonable assumptions to simplify the problem without losing essential features.
- Mathematical Formulation: Convert words and assumptions into mathematical symbols, functions, and equations (e.g., linear equations, quadratic models).
- Solving the Model: Apply algebraic, geometric, or arithmetic methods to obtain mathematical solutions.
- Interpretation & Validation: Translate the solution back into the real-world context and test whether the results are practical and accurate. If not, refine the assumptions and repeat.
Question 2: A small business manufactures items where the fixed daily setup cost is Rs. 500 and the production cost per item is Rs. 20. (i) Formulate a mathematical model for the total daily cost C(x) for producing x items. (ii) Calculate the total cost for producing 45 items in a day. (iii) If the daily expenditure budget is Rs. 1700, how many items can be produced?
Solution:
Step 1: Mathematical Formulation
Let the number of items produced per day be x.
Fixed daily setup cost = Rs. 500
Variable cost for x items = 20 × x = 20x
Total daily cost function C(x) is given by:
C(x) = 500 + 20x
Step 2: Calculate cost for 45 items
Substitute x = 45 into the model equation:
C(45) = 500 + 20 × 45
C(45) = 500 + 900 = Rs. 1400
Step 3: Calculate items produced for a budget of Rs. 1700
Set C(x) = 1700:
1700 = 500 + 20x
20x = 1700 - 500
20x = 1200
x = 1200 / 20 = 60 items.
Conclusion: The mathematical model is C(x) = 500 + 20x. Producing 45 items costs Rs. 1400, and 60 items can be produced with a budget of Rs. 1700.
Question 3: A stone is dropped from a cliff of height 80 meters. Its height h(t) in meters after t seconds is modeled by the equation h(t) = 80 - 4.9t². (i) Find the height of the stone after 2 seconds. (ii) Calculate the time taken by the stone to hit the ground.
Solution:
Step 1: Given Model Equation
h(t) = 80 - 4.9t², where t is time in seconds and h(t) is height in meters.
Step 2: Find height at t = 2 seconds
Substitute t = 2 into the equation:
h(2) = 80 - 4.9 × (2)²
h(2) = 80 - 4.9 × 4
h(2) = 80 - 19.6 = 60.4 meters.
Step 3: Find time taken to hit the ground (h = 0)
Set h(t) = 0:
0 = 80 - 4.9t²
4.9t² = 80
t² = 80 / 4.9 = 800 / 49
t = √(800 / 49) = (20 × √2) / 7
Taking √2 ≈ 1.414:
t = (20 × 1.414) / 7 = 28.28 / 7 ≈ 4.04 seconds.
Conclusion: After 2 seconds, the height is 60.4 meters, and the stone hits the ground in approximately 4.04 seconds.
Question 4: A deposit of Rs. 10,000 is made at an interest rate of 10% per annum. (i) Write the mathematical models for total amount after 't' years under Simple Interest and Compound Interest (compounded annually). (ii) Compare the total amount after 3 years for both models.
Solution:
Step 1: Formulate the Models
Given Principal (P) = Rs. 10,000, Rate (r) = 10% per annum, Time = t years.
- Simple Interest Model (ASI):
Interest = (P × r × t) / 100 = (10000 × 10 × t) / 100 = 1000t
ASI(t) = P + Interest = 10000 + 1000t - Compound Interest Model (ACI):
ACI(t) = P × (1 + r/100)t = 10000 × (1 + 10/100)t = 10000 × (1.1)t
Step 2: Calculate for t = 3 years
For Simple Interest:
ASI(3) = 10000 + 1000 × 3 = 10000 + 3000 = Rs. 13,000.
For Compound Interest:
ACI(3) = 10000 × (1.1)³ = 10000 × 1.331 = Rs. 13,310.
Step 3: Comparison
Difference = ACI(3) - ASI(3) = 13310 - 13000 = Rs. 310.
Conclusion: Compound Interest yields Rs. 310 more than Simple Interest after 3 years.
Question 5: Discuss the advantages and limitations of Mathematical Modelling in solving real-world problems.
Solution:
Advantages of Mathematical Modelling:
- Predictive Power: Allows us to forecast future trends (e.g., weather forecasts, population growth) without carrying out costly experiments.
- Cost & Safety: Helps test critical systems (bridges, rockets, epidemics) safely and cheaply using computer simulations.
- Clarity: Converts ambiguous real-world problems into precise mathematical statements.
Limitations of Mathematical Modelling:
- Simplifying Assumptions: Models rely on assumptions; if an assumption is incorrect, the result can be misleading.
- Complexity: Real-world situations often involve too many unpredictable variables, making exact modelling difficult.
- Context Limitations: A model valid in one situation may not work when applied to another without modification.
ЁЯФН Search more MP Board Solutions
Academic Discussion & Doubts